Film application method and construction panel
11536035 · 2022-12-27
Assignee
Inventors
Cpc classification
B32B13/00
PERFORMING OPERATIONS; TRANSPORTING
B32B27/304
PERFORMING OPERATIONS; TRANSPORTING
E04C2/246
FIXED CONSTRUCTIONS
B32B21/02
PERFORMING OPERATIONS; TRANSPORTING
B32B27/00
PERFORMING OPERATIONS; TRANSPORTING
E04F15/02155
FIXED CONSTRUCTIONS
B32B27/16
PERFORMING OPERATIONS; TRANSPORTING
E04F2203/065
FIXED CONSTRUCTIONS
B32B3/02
PERFORMING OPERATIONS; TRANSPORTING
B32B2270/00
PERFORMING OPERATIONS; TRANSPORTING
B32B7/12
PERFORMING OPERATIONS; TRANSPORTING
B32B27/306
PERFORMING OPERATIONS; TRANSPORTING
E04F2201/07
FIXED CONSTRUCTIONS
International classification
B32B21/02
PERFORMING OPERATIONS; TRANSPORTING
B32B27/16
PERFORMING OPERATIONS; TRANSPORTING
B32B27/00
PERFORMING OPERATIONS; TRANSPORTING
B32B13/00
PERFORMING OPERATIONS; TRANSPORTING
E04C2/24
FIXED CONSTRUCTIONS
B32B3/02
PERFORMING OPERATIONS; TRANSPORTING
E04F15/02
FIXED CONSTRUCTIONS
B32B7/12
PERFORMING OPERATIONS; TRANSPORTING
B32B3/06
PERFORMING OPERATIONS; TRANSPORTING
B32B27/30
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A method of applying a protective film to a construction panel comprising: (a) selectively applying an adhesive composition to a peripheral region of a surface of the construction panel; and/or selectively applying an adhesive composition to a peripheral region of a surface of the protective film; and (b) applying a protective film to the surface of the construction panel to bond the protective film to the construction panel. A construction panel comprising a protective film layer on a surface of the panel and a peripheral adhesive composition layer located between said surface of the panel and the protective film layer, wherein the peripheral adhesive composition layer extends from an edge of the panel and across from about 0.1% to about 25% of the width of the surface.
Claims
1. A method of applying a protective film to a construction panel, the method comprising: (a) selectively applying a first adhesive composition to a peripheral region of a surface of the construction panel at a coat weight of from 15 to 25 grams per square metre; (b) applying the protective film to the surface of the construction panel and bonding the protective film to the peripheral region of the surface of the construction panel by applying a pressure of from 400 kPa to 500 kPa to the peripheral region; wherein: a second adhesive composition is applied to the entire surface of the construction panel at a coat weight of from 30 grams to 60 grams per square metre prior to the step of selectively applying the first adhesive composition to the peripheral region of a surface of the construction panel; and the peripheral region extends from a position inset from the edge of the construction panel by a distance of from 0.5% to 2.5% of the width of the surface of the construction panel and across from 0.5% to 2% of the width of the surface of the construction panel.
2. The method of claim 1, wherein the selectively applying the first adhesive composition to the peripheral region of a surface of the construction panel comprises bead jetting and/or spraying the first adhesive composition onto said peripheral region.
3. The method of claim 2, wherein the bead jetting comprises applying beads of a diameter size of from 1 mm to 8 mm.
4. The method of claim 1, further comprising selectively applying the first adhesive composition to said peripheral region at a temperature of from 80° C. to 220° C.
5. The method of claim 1, further comprising applying the second adhesive composition to the surface of the construction panel at a temperature of from 50° C. to 150° C.
6. The method of claim 1, further comprising applying a third adhesive composition to the protective film before applying the protective film to the construction panel.
7. The method of claim 6, further comprising applying the third adhesive composition to the protective film at a coat weight of from 5 grams to 100 grams per square metre.
8. The method of claim 6, further comprising applying the third adhesive composition to the protective film at a temperature of from 80° C. to 220° C.
9. The method of claim 1, wherein the surface of construction panel has a temperature of from 5° C. to 60° C. prior to selectively applying the first adhesive composition to said peripheral region.
10. The method of claim 1, wherein the first adhesive composition, second adhesive composition and/or third adhesive composition is a hot melt adhesive, drying adhesive, pressure sensitive adhesive, contact adhesives or any combination thereof.
11. The method of claim 10, wherein the first adhesive composition, second adhesive composition, and/or third adhesive composition comprises a hot melt adhesive.
12. The method of claim 11, wherein the hot melt adhesive comprises a component selected from the group consisting of waxes, resins, ethylene-vinyl acetate copolymers, polyolefins, polyamides, polyesters, polyurethanes, styrene block copolymers, polycaprolactones, polycarbonates, fluorinated polymers, silicone based polymers, polypyrroles or any combination thereof.
13. The method of claim 1, wherein the protective film comprises polyethylene, polypropylene, polyvinyl chloride, polyethylene terephthalate, polyvinylidene chloride, ethylene vinyl alcohol, ethylene vinyl acetate or any combination thereof.
14. The method of claim 1, wherein the protective film has undergone corona treatment and/or UV stabilization.
15. The method of claim 1, wherein the construction panel is formed of plywood or orientated strand board (OSB).
16. A construction panel obtained by the method of claim 1.
17. The method of claim 1, wherein the panel width is from 300 mm to 1400 mm; the panel length is from 1000 mm to 5000 mm; and the panel thickness is from 3 mm to 100 mm.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Some embodiments of the present invention are described more fully hereinafter with reference to the accompanying figures. In the figures, dimensions may be exaggerated for clarity of illustration.
(2)
(3)
(4)
(5)
(6)
(7) In the following detailed description, only certain embodiments of the present invention have been shown and described, simply by way of illustration. As those skilled in the art would realise, the described embodiments may preferably be modified in various different ways, all without departing from the spirit or scope of the present invention. Accordingly, the drawings and description are to be regarded as illustrative in nature and not restrictive.
DETAILED DESCRIPTION
(8)
(9) Construction panels (not shown) are delivered and loaded on to a feed conveyor system (1). Where the construction panels are delivered in packaging (e.g., bearers, slats, strapping, identification, or labels), before being removed, which is done manually. The panels are loaded, using a forklift truck or any other suitable means, onto the feed conveyer system (1) in either single stack or multiple stack arrangements. The feed conveyor system (1) transports the construction panels automatically towards an in-feed vacuum pick-and-place stacking system (2) which in turn transfers the construction panels onto a machine bed (24). Again, the construction panels are loaded on to the machine bed (24), automatically, in either single stack or as multiple stack arrangement.
(10) An in-feed panel pusher (3) then conveys the construction panels along the machine bed (24) and into an in-feed nip roller (4). The construction panels are then conveyed through a brush roller (5) which cleans the surface of the panels. The brush roller (5) is also fitted with an extraction system to remove any dust on the panel surface. The dust is removed and taken away via an extraction pipe.
(11) The construction panels are then automatically conveyed from the brush roller (5) into a governor roller (6). The governor roller (6) drives the construction panels along the remainder of the machine bed (24) and controls the line speed. The panels are automatically conveyed from the governor roller (6) into a gas radiant heater (7) where the surface of the construction panels is heated to approximately 45° C. From the gas radiant heater station (7), the construction panels are then fed into the heated roller coater (8), where an adhesive composition is applied to the top surface of the construction panels. The heater roller coater (8) is described in more detail below with reference to
(12) The construction panels are then automatically conveyed from the heater roller coater (8) into a bead jetting head (9) and/or spiral spray head (10) where an adhesive bead is jetted and/or sprayed down along a peripheral region (28) (e.g., parallel to the long edges (25) as shown in
(13) The construction panels are then automatically conveyed from the bead jetting head (9) or spiral spray head (10) toward a spiral spray head (11) and a heated oil roller (12). The spiral spray head (11) applies an adhesive composition, from adhesive melting tank (22), onto a protective film that is then fed from a gantry and forced through a roller holder (14). The protective film is then fed around the heated oil roller (12) where the protective film is bonded to the surface of the construction panels under pressure.
(14) The adhesive composition application steps (8), (9), (10) and (11) can be used independently or together depending on the requirements of the construction panel being processed and the types of adhesives used.
(15) The film-bonded construction panels are then automatically conveyed from the heated oil roller (12) into a system of press down rubber wheels (13) where additional pressure is applied along the peripheral region (28) of the construction panels to compensate for any tolerances within the construction panels.
(16) The construction panels are then automatically conveyed from the pressed down rubber wheels (13) to a cutting/inspection table (15) where any excess protective film (e.g., overhanging film) is cut along edges of the construction panels with a sharp instrument before the construction panels are quality checked.
(17) The construction panels are then automatically conveyed from the cutting inspection table (15) to an outfeed nip roller (16) which directs the construction panels to an outfeed pick and place stacking system (17) where the panels are restacked on to outfeed conveyors (18) in either single stack or multiple stack arrangements.
(18) The stacks are then then conveyed from the outfeed conveyor (18) to a packing station, preferably via a forklift truck, where the packs are repackaged into their original/alternative packaging.
(19)
(20) A gap (G) between the rollers (i.e., the distance between the silicon roller (A) and the steel dosing roller (B)) is adjusted to control the coat weight of the adhesive composition being applied to the surface of the construction panel. Typically gaps having measurements of from about 0 mm to about 3 mm are used but, generally, a heavy coat weight can be achieved by using a larger gap as compared to a lighter coat weight. Typical coat weights that can be achieved by the heater roller coater (8) range from about 30 grams to about 100 grams per square metre depending on the type of adhesive composition being used.
(21) In use, an adhesive composition is pumped onto and into the space between the silicon roller (A) and the steel dosing roller (B). The adhesive composition is retained and prevented from spilling from the sides of the rollers by two pneumatic Teflon™ side plates (not shown) situated at each end of the rollers to create a well. The steel dosing roller (B) rotates in the opposite direction to the silicon roller (A) to force the adhesive composition between the rollers, down the well, through the gap (G) between the rollers and onto the surface of a panel (P) located beneath. As the machine bed, shown by (24) in
(22) It will be appreciated that the methods, materials and equipment/machinery described in relation to