Method for inspecting insulation of a secondary battery
11609260 · 2023-03-21
Assignee
Inventors
Cpc classification
G01R31/392
PHYSICS
H01M10/48
ELECTRICITY
G01R27/025
PHYSICS
G01R31/14
PHYSICS
Y02E60/10
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02P70/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H01M2220/20
ELECTRICITY
G01R31/52
PHYSICS
H01M10/0525
ELECTRICITY
International classification
G01R31/00
PHYSICS
H01M10/48
ELECTRICITY
G01R31/14
PHYSICS
H01M10/0525
ELECTRICITY
Abstract
In a method for inspecting the insulation property of a secondary battery by connecting an external DC power supply to the secondary battery charged with an initial charge amount and evaluating the insulation property of the secondary battery based on a converging state of a power-supply current, when a charge amount at which an inclination of a tangent to a charge amount—battery voltage curve representing a relationship between the charge amount and a battery voltage of the secondary battery is smallest is assumed as a minimum-inclination charge amount, and the inclination of the tangent at the minimum-inclination charge amount is assumed as a minimum inclination (αL), the initial charge amount is selected from a range of the charge amount in which the inclination is two or more times the minimum inclination.
Claims
1. A method for inspecting an internal insulation property of a secondary battery, the method including: connecting an external DC power supply to the secondary battery to constitute an inspection circuit; and evaluating the internal insulation property of the secondary battery charged with a predetermined initial charge amount based on a power-supply current passing through the inspection circuit, wherein a rate of change of the charge amount with the battery voltage is denoted as an inclination of a curve representing a relationship between the charge amount and the battery voltage, a charge amount at which the inclination has a minimum value is denoted as a minimum-inclination charge amount, the minimum value is denoted as a minimum inclination, and the predetermined initial charge amount is selected from a range of charge amounts for which the inclination is two or more times the minimum inclination.
2. The method for inspecting the internal insulation property of a secondary battery according claim 1, wherein the predetermined initial charge amount is selected from a range of the charge amounts for which the inclination is three or more times the minimum inclination.
3. The method for inspecting the internal insulation property of a secondary battery according claim 2, wherein the predetermined initial charge amount is selected from a range of the charge amounts larger than the minimum-inclination charge amount.
4. The method for inspecting the internal insulation property of a secondary battery according claim 1, wherein the predetermined initial charge amount is selected from a range of the charge amounts larger than the minimum-inclination charge amount.
5. The method for inspecting the internal insulation property of a secondary battery according to claim 1, wherein a positive terminal of the external DC power supply is connected to a positive terminal of the secondary battery, and a negative terminal of the external DC power supply is connected to a negative terminal of the secondary battery.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
DETAILED DESCRIPTION OF THE EXEMPLARY EMBODIMENTS
(6) A detailed description of an embodiment of this disclosure will now be given referring to the accompanying drawings.
(7) A method for manufacturing the battery 1 including the insulation inspection method to evaluate the internal insulation property of the battery 1 will be described below (see
(8) In an initial charging step S2 (see
(9) Thereafter, the battery 1 is connected to a charging and discharging device (not shown) and charged for initial charge to 90% SOC by constant current constant voltage (CCCV) at an ambient temperature of 20° C. In the present embodiment, the state of the battery 1 having been charged with a maximum charge amount QF is assumed as 100% SOC. If the battery 1 is charged to 100% SOC for the initial charge, Li-deposition is likely to occur during the initial charge and further the positive electrode active material is apt to deteriorate in a subsequent high-temperature aging step S3. For the initial charge, therefore, the battery 1 is preferably charged to about 90% SOC or less.
(10) In the high-temperature aging step S3 (see
(11) In a charge amount adjustment step S5 (see
(12) Herein, a method for determining this initial charge amount Q0 will be described below. When the battery 1 is considered as a condenser, the battery voltage V, the battery capacitance C, and the charge amount Q stored in the battery 1 should have a relationship: V=Q/C, in which the battery voltage V is proportional to the charge amount Q. However, in practice, the battery voltage V is not proportional to the charge amount Q as seen by the charge amount—battery voltage curve CL plotted with a solid line in
(13) The following considers a local battery capacitance Cp(Q) (Cp(Q)=ΔQ/ΔV), which is a local battery capacitance according to the magnitude of the charge amount Q. This local battery capacitance Cp(Q) is the inverse of the inclination α(Q), that is, Cp(Q)=1/α(Q). Thus, it can be seen that the local battery capacitance Cp(Q) also varies depending on the magnitude of the charge amount Q.
(14) Accordingly, when an insulation inspection step S6 which will be described later is performed with the initial charge amount Q0 at which the local battery capacitance Cp(Q) is smaller (i.e., the inclination α(Q) which is the inverse is larger), the battery voltage V more greatly decreases by a slight decrease in the charge amount Q and further the power-supply current I passing through an inspection circuit 100 (see
(15) Specifically, a charge amount Q (a minimum-inclination charge amount QL) at which the inclination α(Q) of a tangent to the charge amount—battery voltage curve CL is smallest and an inclination α(QL) (=αL) of the tangent at this minimum-inclination charge amount QL are first found out. In the battery 1 of the present embodiment, as shown in
(16) Next, the initial charge amount Q0 is selected from the range QR2 of the charge amount Q, in which the inclination α(Q) is two or more times the minimum inclination αL, i.e., α(Q)≥2αL. In the present embodiment, as shown in
(17) In the present embodiment, furthermore, the initial charge amount Q0 may be selected from the range QR3 of the charge amount Q, in which the inclination α(Q) is three or more times the minimum inclination αL, i.e., α(Q)≥3αL. As shown in
(18) The initial charge amount Q0 also may be selected from a range QR2H (QR2b and QR2c) of the charge amount Q that is larger than the minimum-inclination charge amount QL within the foregoing range QR2 of the charge amount Q, specifically, from the ranges expressed as Q4≤Q≤Q6 (23% to 33% SOC) and Q8≤Q≤QF (65% to 100% SOC). Furthermore, the initial charge amount Q0 also may be selected from a range QR3H (QR3b) of the charge amount Q that is larger than the minimum-inclination charge amount QL within the foregoing range QR3 of the charge amount Q, specifically, from the range expressed as Q9≤Q≤QF (78% to 100% SOC). This configuration can prevent the power-supply current I from greatly varying with a slight variation in the battery temperature in the insulation inspection step S6.
(19) In the present embodiment, the initial charge amount Q0 may be selected from the range QR3H (QR3b) of the charge amount Q, concretely, from the range expressed as Q9≤Q≤QF (78% to 100% SOC) so that all the above-described conditions are satisfied. In the present embodiment, concretely, the battery 1 is adjusted to 90% SOC in the charge amount adjustment step S5.
(20) Next, the insulation inspection step S6 (see
(21) In the present embodiment, an equivalent circuit to the inspection circuit 100 may be provided as an equivalent circuit shown in
(22) The power-supply current I is a current flowing from the external DC power supply EP to the battery 1 and the self-discharge current Ip is a self-discharge current flowing through the inside of the battery 1 (the battery component 1C) in association with self-discharge. The external DC power supply EP can change and accurately control the output voltage Vb generated by its own DC power supply EPE. In addition, the external DC power supply EP includes a voltmeter EPV that can measure a battery voltage V (V). The external DC power supply EP also includes an ammeter EPI that can measure, with high accuracy, a current value Ib (μA) of the power-supply current I flowing from the external DC power supply EP (the DC power supply EPE) to the battery 1.
(23) In the voltage application step S61, under a condition that the current value Ib is 0, the battery voltage V of the battery 1 (i.e., the pre-inspection battery voltage V0) is detected by the voltmeter EPV contained in the external DC power supply EP. Then, application of the output voltage Vb equal to this pre-inspection battery voltage V0 (Vb=V0) to the battery 1 is started.
(24) After the start of application of the output voltage Vb (after an application duration time t=0), the current detection step S62 is performed in parallel with the voltage application step S61. Specifically, the current value Ib (t) of the power-supply current I passing through the inspection circuit 100 is detected. In the present embodiment, the current value Ib (t) is detected by the ammeter EPI contained in the external DC power supply EP every time the application duration time t passes 1 second.
(25) Herein, for each of batteries 1 provided as a non-defective product and a defective product,
(26) In contrast, the current value Ib(t) of each battery gradually increases as the application duration time t passes from 0 (zero). Further, from when the application duration time t reaches the convergence time ts, the battery voltage V(t) continues at a substantially constant value (the convergence current value Ibs). However, the current value Ib(t) of the defective battery 1 greatly increases as compared with that of the non-defective battery 1, so that the convergence current value Ibs of the defective battery 1 also becomes a larger value than that of the non-defective battery 1.
(27) In the present embodiment, the initial charge amount Q0 is selected from the range QR2 (QR2a, QR2b, and QR2c) of the charge amount Q that satisfies the condition: α(Q)≥2αL, as described above. Further, the initial charge amount Q0 may be selected from the range QR3 (QR3a and QR3b) of the charge amount Q that satisfies the condition: α(Q)≥3αL. In the present embodiment, concretely, the initial charge amount Q0 corresponding to 90% SOC is selected. Thus, the convergence time ts can be significantly shortened more than when the initial charge amount Q0 is set to QL (Q0=QL). Thus, even though detailed experimental results are omitted, the convergence time ts can be shortened to ½ or less, further to ⅓ or less, specifically to about ¼ than that when the initial charge amount Q0 is set to QL. Accordingly, it is possible to significantly reduce the inspection time required for the insulation inspection step S6, i.e., the current detection step S62.
(28) In the present embodiment, additionally, the initial charge amount Q0 (corresponding to 90% SOC) is selected from the range QR2H of the charge amount Q that is larger than the minimum-inclination charge amount QL within the range QR2 of the charge amount Q. Furthermore, the initial charge amount Q0 may be selected from the range QR3H of the charge amount Q that is larger than the minimum-inclination charge amount QL within the range QR3 of the charge amount Q. Thus, in the insulation inspection step S6 (the current detection step S62), it is possible to prevent the power-supply current I from greatly varying with a slight variation in the battery temperature.
(29) When this current detection step S62 is terminated, the voltage application from the external DC power supply EP to the battery 1 is stopped so that the voltage application step S61 is also terminated. Thereafter, the external DC power supply EP is disconnected from the battery 1 and further the battery 1 is released from the compressed state by the retraining jig (not shown).
(30) In an evaluation step S63, additionally, the internal insulation property of the battery 1 is evaluated based on a converging state of the power-supply current I passing through the inspection circuit 100, that is, based on the magnitude of the convergence current value Ibs detected in the current detection step S62. In the present embodiment, when the convergence current value Ibs is larger than the reference current value Ibk (Ibs>Ibk), the battery 1 is determined to be defective with a low insulation property, in which an internal short circuit has occurred. This battery 1 is thus discarded. In contrast, when the convergence current value Ibs is equal to or less than the reference current value Ibk (Ibs≤Ibk), the battery 1 is determined to be non-defective with a high insulation property. This non-defective battery 1 then undergoes other inspections or the like. Thus, the battery 1 is completed.
(31) The present disclosure is described in the foregoing embodiments, but is not limited thereto. The present disclosure may be embodied in other specific forms without departing from the essential characteristics thereof.
(32) For instance, in the foregoing embodiments, the insulation inspection of the battery 1 is performed in the manufacturing process of the battery 1, but not limited thereto. The insulation inspection of the battery 1 may be performed on a spent battery 1 after mounted on an automobile or the like or after put alone on the market.
(33) Further, in the voltage application step S61 in the foregoing embodiment, the output voltage Vb applied from the external DC power supply EP to the battery 1 is constant (Vb=V0) regardless of the elapse of the application duration time t, but is not limited thereto. For instance, as described in JP 2019-113450A, an alternative method may be configured such that the output voltage Vb at the start of voltage application (the application duration time t=0) is set to be as large as the pre-inspection battery voltage V0 of the battery 1, that is, Vb=V0, while the output voltage Vb after the start of application is increased gradually or stepwise.
REFERENCE SIGNS LIST
(34) 1 Secondary battery (Battery) 100 Inspection circuit S5 Charge amount adjustment step S6 Insulation inspection step Q Charge amount (stored in a battery) Q0 Initial charge amount QL Minimum-inclination charge amount QR2 Range (of a charge amount in which an inclination is two or more times a minimum inclination) QR2H Range (of a charge amount larger than the minimum-inclination charge amount within a charge amount range QR2) QR3 Range (of a charge amount in which an inclination is three or more times a minimum inclination) QR3H Range (of a charge amount larger than the minimum-inclination charge amount within a charge amount range QR3) C Battery capacitance Cp(Q) Local battery capacitance CL Charge amount—battery voltage curve α(Q) Inclination (of a tangent) αL Inclination I Power-supply current Ib(t) Current value EP Battery voltage