E02D27/425

Covering tent for surrounding a wind turbine at its base during a grouting operation
09828787 · 2017-11-28 · ·

A tent for surrounding a base of an upstanding structure on a support surface is disclosed. The tent features a covering with a top edge arranged to follow a perimeter of the structure base and a bottom edge arranged to define an outer periphery of the covering. The tent additionally features a base strap arranged for forming a closed loop about the structure base at a predetermined height above the support surface. The base strap supports a first attachment member, and a second attachment member is located along the top edge of the covering for cooperating with the first attachment member to fasten the covering at the structure base. A tightening strap along the top edge of the covering but behind the second attachment member is arranged to follow the base strap to seal connection of the covering and the base strap.

TRANSITION ELEMENT FOR THE TRANSMISSION OF STRAINS BETWEEN A TOWER AND A SUB-STRUCTURE ON A FLOATING MONOLITHIC CONCRETE STRUCTURE FOR SUPPORTING MARINE WIND TURBINES

The invention relates to the embodiment, by means of a pre-stressed concrete layer, on floating structures for supporting wind turbines, of the transition zone between the tower, of a lesser diameter, and the concrete float, of a greater diameter, whether the tower is made of metal or concrete. Said layer of revolution has the optimum geometry for the correct transmission of forces between the two parts, the tower and the float, with a reduced thickness and without the need for external rigidifying and reinforcing elements on the surfaces thereof, which would increase the weight and the cost of the structure.

RETROFIT REINFORCING STRUCTURE ADDITION AND METHOD FOR WIND TURBINE CONCRETE GRAVITY SPREAD FOUNDATIONS AND THE LIKE
20220356669 · 2022-11-10 · ·

A retrofit reinforcing structure addition and method for an existing gravity spread foundation for a wind turbine or the like having a central pedestal and a spread section is provided. The retrofit structure addition includes a collar formed around the pedestal of the spread foundation. The collar is formed by a shape sustaining member, such as a CMP, placed around the pedestal to define an annular ring between the CMP and the pedestal that is filled with cementitious material. Radial bolts extend horizontally through the collar and into the side of the pedestal. Soil and/or rock anchor bolts extend vertically through the collar, the spread portion of the foundation and into the underlying soil and/or rock substrate. The radial and anchor bolts are post-tensioned to ensure that the cementitious material of the collar remains in compression and the bolts are always in static tension, strengthening the original gravity spread foundation and extending the fatigue life thereof.

PRESTRESSED-BOLTED DRY-ASSEMBLED SEGMENTAL PRECAST HYBRID TOWER WITH GROUTING-FREE

The present invention discloses a prestressed-bolted dry-assembled segmental precast hybrid tower with grouting-free, comprising a top steel tower tube, a reverse self-balancing steal-concrete transition section, and a prestressed-bolted dry-assembled segmental precast concrete tower with grouting-free dry fast splicing and a gear reinforced wind turbine foundation; the steel tower tube, the steel-concrete transition section, the concrete tower tube and the hollow wind turbine foundation are integrally connected from top to bottom through a prestressed steel strand system to improve the overall bending resistance of the tower; the upper end of the prestressed steel strands is anchored to the steel-concrete transition section, and the lower end is anchored to the bottom face of the wind turbine foundation corbel; the concrete tower tube is composed of a number of segmental tapered precast concrete tower segments, which are grouting free spliced vertically, and the vertical splicing utilizes positioning pins to accurately position the installation position. The prefabricated concrete tower tube segment is formed by a number of circular arc-shaped prefabricated concrete pipe segments with circumferential grouting free dry splicing. The segments are spliced into a whole by prestressed bolts and then installed staggered from top to bottom to enhance the shear resistance.

Device and method for anchoring a wind turbine
09790925 · 2017-10-17 · ·

The present invention concerns an anchoring section for anchoring a pylon of a wind power installation in a foundation, including a carrier portion for fixing a pylon segment for carrying the pylon and a foundation portion for concreting in a concrete mass of the foundation, and the foundation portion has at least one web portion with through openings for reinforcing bars to pass therethrough.

Method and apparatus for manufacturing marine foundation
11668065 · 2023-06-06 · ·

A method and fixturing apparatus for manufacturing a suction caisson foundation includes providing an elevated center support and peripheral supports, elevating the foundation's prefabricated thumb section atop the center support, and temporarily securing radial frame members about the circumference of the prefabricated thumb section with the each frame member resting atop a respective peripheral support. The skirt panels are then affixed to the frame members, and the frame members to the prefabricated thumb section to thereby become self-supporting. The center support is removed from the interior of the resulting bucket, as by raising the peripheral supports to unload the center support, and lowering and dismantling the center support, whereupon additional panels are affixed to the frame members to define the foundation's lid, and further shaft sections added atop the prefabricated thumb section to complete the foundation. Temporary beams bridging preselected framing members advantageously allow use of transportation crawlers.

Floating-body type wind turbine power generating apparatus and method of transporting components of the same
09822767 · 2017-11-21 · ·

A floating-body type wind turbine power generating apparatus includes a floating body floating on a water surface; and a wind turbine disposed on the floating body and configured so that at least a part of the wind turbine is submersible. The wind turbine includes: at least one blade; a hub to which the blade is mounted; a tower erected on the floating body; a nacelle disposed on the tower; a first electrical device disposed inside the hub or the nacelle; and a second electrical device connected to the first electrical device via a cable and configured to be movable relative to the tower in a vertical direction so as not be submerged upon submergence of the wind turbine.

Floating offshore wind power generation facility

A floating offshore wind power generation facility includes a floating body, a mooring cable, a tower, and a windmill installed at the top of the tower, the windmill including a nacelle and a plurality of blades. The rotation axis of the windmill has a predetermined upward angle to avoid contact between the blades and the tower, and the windmill is of a downwind type in which the blades are attached to the leeward side of the nacelle and installed with the back surfaces of the blades facing windward, and the mooring point of the mooring cable to the floating body is set at a position below the surface of the sea and higher than the center of gravity of the floating body.

METHOD OF AND SYSTEM FOR INSTALLING FOUNDATION ELEMENTS IN AN UNDERWATER GROUND FORMATION
20170275845 · 2017-09-28 ·

A method of installing foundation elements, in particular (mono)piles having a diameter of five meters or more, in an underwater ground formation includes lowering a leader from a surface vessel with at least the tip of the leader into the water, and lowering a foundation element and/or a noise mitigation screen along the leader.

METHOD AND DEVICE TO CREATE A FOUNDATION AS WELL AS A FOUNDATION

A method and a device to create a foundation in which a foundation pipe is driven into the soil. At least one bore is created into the soil in the perimeter area of the foundation pipe to insert before ramming by means of a drilling tool the diameter of which is significantly smaller than a diameter of the foundation pile. The soil material removed during drilling remains essentially within the bore. Furthermore, a foundation with a foundation pipe which is created accordingly.