20230014744 · 2023-01-19 ·

A method of erecting a multi-storey structure is disclosed. During construction, at least a portion of a perimeter facade of the structure is disposed to extend at least two storeys height beyond an upper work area of the structure and forms at least part of a safety barrier for that work area and wherein in erecting the multi-story structure, at least one further floor of the structure is erected over the upper work area. The further floor forming a respective subsequent upper work area of the structure, and wherein at least a portion of the facade is disposed to extend at least one storey height beyond the uppermost of the subsequent work areas.

House designing system
11525273 · 2022-12-13 · ·

The present invention relates to a Tetris house designing system, and the technical problem to solve is to facilitate house design by laymen and enable a simulation for a finally decided house structure. For example, disclosed is a Tetris house designing system comprising: a unit interior space providing part for providing respective unit interior spaces of a house by dividing the unit interior spaces into three-dimensional blocks reflecting the actual areas of certain sizes; a unit interior space selection part for selecting the type and number of the unit interior spaces; a house structure generation part for generating house structure data by combining three-dimensional blocks selected by the house unit interior space selection part; and a virtual reality data providing part for generating and providing virtual reality data on the basis of the house structure data.

MODULAR CONFIGURABLE STRUCTURAL UNIT SYSTEM
20220356698 · 2022-11-10 · ·

A modular configurable multi-purpose system is provided. The system comprises at least one unit that has at least one room. The units are configured into at least one section, and arranged end to end or as called for in the application. A support section, having at least one support unit, may be provided for providing space for working, storage and other services for those working in the system. The system may be configured in numerous combinations to adapt to the immediate needs of the situation, and installed indoors and in the external environment. A method of operation of the system is provided.

BUILDING SYSTEM
20230094441 · 2023-03-30 ·

Disclosed is an assembly for a flooring support structure of a prefabricated or factory made building, comprising a plate configured to boarder a peripheral edge of the flooring support structure in perpendicular planar configuration to the flooring support structure and a floor joist assembly coupled between an outer structural support beam of the flooring support structure and the plate. The floor joist assembly is configured to position below a wall framing structure supported atop the flooring support structure and to provide an open space below the wall framing structure to enable utility components to be contained within and run down the wall structure and through the open space. The disclosed assembly further allows installation of waterproofing on the exterior of the building structure and enables an exterior finish to terminate above grade level for exterior drainage and superior waterproofing.

REINFORCED FLOORS FOR MODULAR BATHROOMS
20230098163 · 2023-03-30 · ·

Reinforced floor components of prefabricated bathroom pods. The floor components are reinforced and integrated into bathroom pods or other building units in such a manner as to add significant strength to the bathroom pods to resist bending, twisting and sagging, and/or to aid in lifting and supporting the weight of the bathroom pods, and thereby add to the structural integrity of the prefabricated bathroom pods to which they are attached.

Air transportable modular shipping container for edge data centers
11606877 · 2023-03-14 · ·

This invention describes the use of pre-packaged air shipping containers for delivery of edge data center equipment. The containers are capable of rapid deployment and positioning at the edge data center delivery site to minimize time between the order of equipment and deployment of a functioning edge data center. The containers allow for easy access, and rapid repair/replacement of modular edge data center equipment.

SYSTEM FOR BUILDING PREFABRICATED MODULAR, SEALED, AND PRESSURIZED HABITATS
20230130786 · 2023-04-27 ·

A system for sealing prefabricated facilities or underground facilities may allow for the sealing and pressurizing of parts or all of an underground facility or enclosed facility via a plurality of sealable doors or prefabricated modules. The system may implement mechanical connections between walls or extensions of individual modules. The system may implement complementary mechanical connections or partially complementary mechanical connections between individual modules and may further include module interior or module exterior sealing layers for rigid layers. The system may implement mechanical connections between individual modules wherein each of the mechanical connections may utilize sealing complementary profiles constructed and arranged to provide for an airtight seal between modules. The system may be used to link surface facilities to underground facilities, tunnels or shafts, or to pressurize sections of tunnels or shafts. The system may be used to stabilize pressurized facilities from back-blast due to evacuation of said tunnels or shafts. The system may be used to construct pressurized surface habitats independent of, or linked to underground tunnels or facilities. The system may further be used to construct space platforms or space stations.

FABRICATION METHOD OF A PLANT FACILITY

To reduce work at an installation site when a plant facility is manufactured, modules are conveyed in order from a fabrication yard to the installation site, and expansion and contraction amounts of pipe spools are calculated based on a temperature difference between a temperature at the fabrication yard when the modules are manufactured and a temperature at the installation site when the modules are installed at the installation site. Further, an installation position of a foundation is adjusted toward a direction to cancel out the expansion and contraction amounts of the plurality of pipe spools, and the pipe spool is moved toward the direction to cancel out the expansion and contraction amounts of the plurality of pipe spools. The modules are installed with the positions of the end portions of the pipe spools being adjusted.

AIR TRANSPORTABLE MODULAR SHIPPING CONTAINER FOR DATA CENTERS
20230209764 · 2023-06-29 ·

This invention describes the use of pre-packaged air shipping containers for delivery of edge data center equipment. The containers are capable of rapid deployment and positioning at the edge data center delivery site to minimize time between the order of equipment and deployment of a functioning edge data center. The containers allow for easy access, and rapid repair/replacement of modular edge data center equipment.

MULTI-STORY MODULAR HOUSE AND CONNECTION ASSEMBLY THEREOF

The present application belongs to the field of architecture, and specifically provides a multi-story modular house and its connection assembly; the connection assembly includes a connector, a first connection module for connecting with the first box, and a second connection module for connecting with the second box, and the connector has a connection part, a shear resistance part and a calibration part connected in sequence. The connection part is used to connect with the first connection module. The second connection module is equipped with a calibration hole and a grouting chamber. The shear resistance part is a tooth-like structure, and the tooth-like structure is used to connect with the irrigation The grouting materials in the grouting chamber are meshed; the first box and the second box of the multi-story modular house are connected by the above-mentioned connection assembly.