E21D9/122

Tunneling device for pipe jacking and its construction method
11242748 · 2022-02-08 · ·

A tunneling apparatus for use in a pipe jacking method including an excavating apparatus, a head front-end track, a middle-section track, and a rear device. The excavating apparatus includes a transmission device and a chain blade. The transmission device includes a driving device and a sprocket. During construction, the chain blade for excavating rock and earth runs on the head front-end track and the middle-section track. The shape of a head excavation face is the same as that of the cross-section of a pipe section. The rear apparatus includes a jacking device mounted in a construction well. The front end of the middle-section track is connected to the head front-end track, and the tail end of the middle-section track is connected to the rear device. During construction, the driving device drives the chain blade, so that the chain blade runs along the tracks. Blades on the head front-end track excavate the ring-shaped rock and earth in a projection part of the cross-section of the pipe section.

Tunneling Device for Pipe Jacking and Its Construction Method
20190383142 · 2019-12-19 ·

Disclosed is a tunneling apparatus for use in a pipe jacking method, the tunneling apparatus including an excavating apparatus (1), a head front-end track (2), a central track (3) and a rear apparatus (4), wherein the excavating apparatus (1) is composed of a transmission apparatus (1-1) and a cutter (5), the transmission apparatus (1-1) being composed of a driving apparatus (1-1-1) and a sprocket (1-1-3); during construction, the chain cutter (5) for excavating rock and earth runs on the head front-end track (2) and the central track (3), and the shape of a head excavation face is the same as that of the cross section of a tube section (6); the rear apparatus (4) comprises a jacking apparatus (4-1), mounted in a construction well; the front end of the central track (3) is connected to the head front-end track (2), the tail end of the central track (3) is connected to the rear apparatus (4), and during construction, the driving apparatus (1-1-1) drives the chain cutter (5), so that the chain cutter (5) runs along the tracks; and a cutter on the head front-end track (2) excavates the ring-shaped rock and earth in a projection part of the cross section of the tube section (6). In a work well, an operating platform is constructed, and the impact on the surrounding environment is low. The head of a first tube section (6) is an excavating face of the excavating apparatus (1), excavated rock and earth are driven along with the chain cutter (5) into the work well, the tube section (6) is ejected into position and then the rock and earth are cleared in the tube section (6), construction is simple, quality is good, the construction period is short, and costs are low.