F03D7/0292

METHOD OF RETROFITTING A WIND TURBINE WITH AN ENERGY GENERATING UNIT
20230050065 · 2023-02-16 ·

A method of retrofitting a wind turbine having a tower and a first energy generating unit with a second energy generation unit is disclosed. The wind turbine has been operated for a first period of time at a first tower life rate and has a first tower life expectancy design value. The method includes determining the tower life of the wind turbine tower used during the first period of time; determining the remaining tower life of the wind turbine tower; replacing the first energy generating unit with the second energy generating unit; and operating the retrofitted wind turbine at a second tower life rate less than the first tower life rate so as to extend the life expectancy value of the tower beyond the first tower life expectancy design value.

System and method for improved extreme load control for wind turbine components

A method for reducing extreme loads acting on a component of a wind turbine includes measuring, via one or more sensors, a plurality of operating parameters of the wind turbine. Further, the method includes predicting at least one blade moment of at least one rotor blade of the wind turbine based on the plurality of operating parameters. The method also includes predicting a load and an associated load angle of the at least one rotor blade as a function of the at least one blade moment. Moreover, the method includes predicting a pitch angle of the at least one rotor blade of the wind turbine. In addition, the method includes generating a load envelope for the component that comprises at least one load value for the pitch angle and the load angle. Thus, the method includes implementing a control action when the load is outside of the load envelope.

Wind turbine and method for detecting and responding to loads acting thereon
11525432 · 2022-12-13 · ·

A method for operating a wind turbine for generating electrical power from wind, wherein the wind turbine has an aerodynamic rotor with a rotor hub and rotor blades of which the blade angle is adjustable, and the aerodynamic rotor can be operated with a variable rotation speed, and the wind turbine has a generator, which is coupled to the aerodynamic rotor, for the purpose of generating a generator power, wherein the generator can be operated with a variable generator torque, comprising the steps of: determining a loading variable which indicates a loading on the wind turbine by the wind, and reducing the rotation speed and/or the generator power in a loading mode depending on the loading variable, wherein at least one force variable that acts on the wind turbine is used for determining the loading variable or as the loading variable.

METHOD FOR RETROFITTING A WIND TURBINE WITH AN ENERGY GENERATING UNIT
20220381225 · 2022-12-01 ·

A method of retrofitting a wind turbine having a tower and a first energy generating unit with a second energy generating unit. The method includes analyzing a first natural frequency of the tower relative to first rated operation frequencies of the tower having the second energy generating unit; when the first natural frequency lies within the first rated operation frequencies, modifying one or both the tower and the second energy generating unit so that the modified one or both the tower and the second energy generating unit have a second natural frequency and second rated operation frequencies that do not overlap; and replacing the first energy generating unit with the second energy generating unit.

Power control method and apparatus for wind power generator

A power control method and apparatus for a wind power generator. The power control method comprises: predicting, according to historical wind resource data, wind resource data within a predetermined future time period (S10); estimating, according to the remaining design lifetime of a wind power generator, the maximum design lifetime allowed to be consumed within the predetermined future time period (S20); determining, according to the predicted wind resource data and the estimated maximum design lifetime, optimal output powers of the wind power generator in respective wind velocity ranges within the predetermined future time period (S30); and controlling operation of the wind power generator according to the determined optimal output powers of the wind power generator in the respective wind velocity ranges within the predetermined future time period (S40).

SYSTEM AND METHOD FOR SCHEDULING PREVENTATIVE MAINTENANCE ACTIONS BASED ON OPERATIONAL USAGE

A method for operating and maintaining a wind farm comprising a plurality of wind turbines includes determining an odometer for one or more components of at least one of the pluralities of wind turbines in the wind farm, the odometer representing operational usage of the component(s). The method also includes tracking the operational usage for the component(s) using the odometer and a usage threshold. Further, the method includes predicting an expected time frame for one or more preventative maintenance actions based on a comparison of the tracked operational usage and the usage threshold. Moreover, the method includes triggering scheduling of the one or more preventative maintenance actions when the prediction indicates that the tracked operational usage will exceed the usage threshold. In addition, the method includes shutting down the wind turbine or idling the wind turbine once the one or more preventative maintenance actions are scheduled.

Method and apparatus for cooperative controlling wind turbines of a wind farm

Provided is an apparatus and method for cooperative controlling wind turbines of a wind farm, wherein the wind farm includes at least one pair of turbines aligned along a common axis approximately parallel to a current wind direction and having an upstream turbine and a downstream turbine. The method includes the steps of: a) providing a data driven model trained with a machine learning method and stored in a database, b) determining a decision parameter for controlling at least one of the upstream turbine and the downstream turbine by feeding the data driven model with the current power production of the upstream turbine which returns a prediction value indicating whether the downstream turbine will be affected by wake, and/or the temporal evolvement of the current power production of the upstream turbine; c) based on the decision parameter, determining control parameters for the upstream turbine and/or the downstream turbine.

Method of retrofitting a wind turbine with an energy generating unit

A method of retrofitting a wind turbine having a tower and a first energy generating unit with a second energy generation unit is disclosed. The wind turbine has been operated for a first period of time at a first tower life rate and has a first tower life expectancy design value. The method includes determining the tower life of the wind turbine tower used during the first period of time; determining the remaining tower life of the wind turbine tower; replacing the first energy generating unit with the second energy generating unit; and operating the retrofitted wind turbine at a second tower life rate less than the first tower life rate so as to extend the life expectancy value of the tower beyond the first tower life expectancy design value.

System for operating a wind turbine using cumulative load histograms based on actual operation thereof

A method for operating a wind turbine includes determining one or more loading and travel metrics or functions thereof for one or more components of the wind turbine during operation of the wind turbine. The method also includes generating, at least in part, at least one distribution of cumulative loading data for the one or more components using the one or more loading and travel metrics during operation of the wind turbine. Further, the method includes applying a life model of the one or more components to the at least one distribution of cumulative loading data to determine an actual damage accumulation for the one or more components of the wind turbine to date. Moreover, the method includes implementing a corrective action for the wind turbine based on the damage accumulation.

Odometer-based control of a wind turbine power system

A method for controlling a wind turbine connected to an electrical grid includes receiving, via a controller, a state estimate of the wind turbine. The method also includes determining, via the controller, a current condition of the wind turbine using, at least, the state estimate, the current condition defining a set of condition parameters of the wind turbine. Further, the method includes receiving, via the controller, a control function from a supervisory controller, the control function defining a relationship of the set of condition parameters with at least one operational parameter of the wind turbine. Moreover, the method includes dynamically controlling, via the controller, the wind turbine based on the current condition and the control function for multiple dynamic control intervals.