E04G17/0657

Concrete Wall Form Removable Bolt Tie Sleeve
20220364377 · 2022-11-17 ·

The Concrete Wall Form Removable Bolt Tie Sleeve is a process developed that utilizes a flexible polyolefin plastic sleeve to improve the efficiency of the current concrete wall forming process. The bolt tie is placed inside the flexible polyolefin plastic sleeve before inserted into the wall form. The sleeve saves the installer time by no prior greasing of the bolt tie, no returning on site to “turn” the bolt tie, and no cleaning of the bolt tie after it has been removed. The flexible polyolefin plastic allows the sleeve to not adhere to the concrete, allowing the bolt tie and the flexible polyolefin plastic sleeve to be easily removed after the concrete has dried.

FORMWORK PANEL, FORMWORK SYSTEM AND METHOD FOR MOUNTING A TIE ROD
20220042330 · 2022-02-10 ·

A formwork panel including: a formwork panel member having a front side for delimiting a space to be filled with concrete, a back side opposite the front side and a through-opening extending from the front side to the back side for allowing passage of a tie rod therethrough, the through-opening having a first cross-sectional area; an adjustment member extending across the through-opening of the formwork panel member, the adjustment member having a through-hole with a second cross-sectional area smaller than the first cross-sectional area of the through-opening of the formwork panel member, the through-hole being moveable relative to the front side of the formwork panel member; the adjustment member having a disc element with the through-hole formed therein, wherein the disc element covers the through-opening of the formwork panel member except for the through-hole of the disc element.

CLOSED WALL HOLD DOWNS
20220228392 · 2022-07-21 · ·

A closed wall hold down system is provided including at least one closed wall panel, at least one first tie rod, at least one second tie rod, at least one coupler nut, and at least one ratcheting take-up device. The at least one closed wall panel includes a bottom plate and a top plate. The at least one first tie rod projects through the bottom plate. The at least one coupler nut is coupled to the at least one first tie rod and to a first end of the at least one second tie rod. A second end of the at least one second tie rod extends through the top plate. The at least one ratcheting take-up device engages the second end of the at least one second tie rod. A method of installing the closed wall hold down system is also provided.

Formwork panel, formwork system and method for mounting a tie rod
11199013 · 2021-12-14 · ·

The disclosure relates to a formwork panel comprising: a formwork panel member having a front side for delimiting a space to be filled with concrete, a back side opposite the front side and a through-opening extending from the front side to the back side for allowing passage of a tie rod therethrough, the through-opening having a first cross-sectional area; an adjustment member extending across the through-opening of the formwork panel member, the adjustment member having a through-hole with a second cross-sectional area smaller than the first cross-sectional area of the through-opening of the formwork panel member, the through-hole being moveable relative to the front side of the formwork panel member. Furthermore, the disclosure relates to a formwork system and a method using such formwork panel.

Anchor with sealing element for a vertical formwork
11359391 · 2022-06-14 · ·

An anchor for a vertical formwork having two formwork panels facing one another. The anchor is suitable for being fixed to one of the formwork panels. The anchor includes a housing for receiving a part of a tie rod fixing the two formwork panels and a single sealing element configured for sealing the anchor with respect to the formwork panel in which it is fixed and with respect to the tie rod housed in the housing of the anchor.

Formwork panel, formwork system and method for mounting a tie rod
11725404 · 2023-08-15 · ·

A formwork panel including: a formwork panel member having a front side for delimiting a space to be filled with concrete, a back side opposite the front side and a through-opening extending from the front side to the back side for allowing passage of a tie rod therethrough, the through-opening having a first cross-sectional area; an adjustment member extending across the through-opening of the formwork panel member, the adjustment member having a through-hole with a second cross-sectional area smaller than the first cross-sectional area of the through-opening of the formwork panel member, the through-hole being moveable relative to the front side of the formwork panel member; the adjustment member having a disc element with the through-hole formed therein, wherein the disc element covers the through-opening of the formwork panel member except for the through-hole of the disc element.

FORMWORK TIE
20220259872 · 2022-08-18 ·

A tie rod of a formwork tie for connecting two formwork elements, which are disposed opposite and at a distance from one another, is provided with two opposing flattened regions, and a tie nut is provided with a radial fixing screw, which can optionally be screwed against one of the two flattened regions for securing the tie nut on the tie rod, whereby the distance between the two formwork elements can be set in steps of one half a lead of an external thread of the tie rod.

Vertical formwork and an anchor for a vertical form work
11047144 · 2021-06-29 · ·

According to one embodiment a rear anchor assembly for a vertical formwork is provided that includes a dome plate having a spherical-shaped central section. The dome plate has an opening that extends through the spherical-shaped central section. The rear anchor assembly also includes a nut with a threaded hole configured for housing a threaded end of a tie rod. The nut includes a spherical portion arranged in the opening of the dome plate. The spherical portion of the nut and the spherical-shaped central section of the dome plate are coupled like a ball and socket joint. The rear anchor assembly also includes a support plate configured for being fixed to a rear formwork panel, the support plate including a housing in which the dome plate is arranged, the dome plate having freedom of radial movement with respect to the support plate inside the housing.

Closed shear wall hold down system
11105110 · 2021-08-31 · ·

A closed wall hold down system is provided including at least one closed wall panel, at least one first tie rod, at least one second tie rod, at least one coupler nut, and at least one ratcheting take-up device. The at least one closed wall panel includes a bottom plate and a top plate. The at least one first tie rod projects through the bottom plate. The at least one coupler nut is coupled to the at least one first tie rod and to a first end of the at least one second tie rod. A second end of the at least one second tie rod extends through the top plate. The at least one ratcheting take-up device engages the second end of the at least one second tie rod. A method of installing the closed wall hold down system is also provided.

ANCHOR FOR A VERTICAL FORMWORK AND VERTICAL FORMWORK
20210040753 · 2021-02-11 ·

An anchor for a vertical formwork having two formwork panels facing one another. The anchor is suitable for being fixed to one of the formwork panels. The anchor includes a housing for receiving a part of a tie rod fixing the two formwork panels and a single sealing element configured for sealing the anchor with respect to the formwork panel in which it is fixed and with respect to the tie rod housed in the housing of the anchor.